SKU: AC149_LONG_ Categories: ,

Braemar Drain Valve & Shutoff 24V with Long Lead

AUD$450.00

Compare

Braemar Drain Valve & Shutoff 24V with Long Lead

The Braemar & Breezair drain valve shut off is a genuine replacement solenoid valve designed to control water drainage in evaporative cooling systems. Engineered for compatibility with Braemar and Breezair units, it ensures efficient water management and system protection. With a 24VAC operating voltage and robust construction, this valve supports reliable performance in residential and commercial installations. Ideal for servicing EM, ES, and EV series models, it’s trusted by HVAC professionals for its durability and ease of installation.

Features:

  • Genuine Braemar / Breezair part (cross-reference: 107684, 105345)
  • Solenoid-operated shutoff valve for evaporative coolers
  • 24VAC input for standard HVAC control systems
  • Durable construction for high-moisture environments
  • Supports efficient water drainage and system protection
  • Easy to install with standard fittings
  • Widely used by technicians across Australia

Suits Models:

Breezair – EXQ, EZQ, EXS, EXD, EZD, EXH, EZH, Braemar – BMQ, LCQ, LCS, LCB, Coolair – CVP, CPL, CPS, CPQ